Industrial Warehouse, Marsden Park
- Industrial
- Pump, place and finish
- 51m boom pump supported by line pumps
- Marsden Park NSW
- $1.5M pump, place and finish | 2,000m³ concrete slab
House slabs move quickly once the trucks arrive. Getting concrete from the street to the formwork is where the day is won or lost, so the placement path is worth planning before the pour date.
House slabs move quickly once the trucks arrive. Getting concrete from the street to the formwork is where the day is won or lost, so the placement path is worth planning before the pour date.
Based in Botany NSW, servicing Sydney and surrounding areas.
These site details decide how we set up the pump. This list is a guide only. It does not approve a site or a method.
Every site is different. Hulkcrete will discuss the requirements of your project with you and confirm the appropriate approach directly. Information on this website does not approve a site, placement method or equipment selection.
Where the pump can safely stand, how far it sits from the placement area, and what is in between.
Power lines, trees and eaves near the set-up point, discussed before anything is scheduled.
How concrete deliveries line up with the placement window on the day.
Where washout happens on site, agreed with you in advance.
Our safety record, fleet and client reviews.
Based in Botany NSW, servicing Sydney and surrounding areas.
Safe Work Method Statements prepared for the pour before work starts.
Maintained across complex commercial and industrial projects.
Matched to access, height and volume on the day.
Placement and finishing crews available alongside pumping.
Anthony Kapeanells
Trescon
Exceptional and professional throughout. The crew worked collaboratively with us and kept the site safe and innovative from start to finish.
Posted on Google
Carlos Ramirez
Site Manager
Reliable and professional. The pour was seamless, safe and on time.
Posted on Google
Emily Chen
Commercial Project Manager
Straightforward, reliable and flexible. Communication kept us informed and the pours stayed on track.
Posted on Google
Real Hulk Crete work on site, alongside project details from the capability statement. The gallery photos are not attributed to the named projects.



From Hulk Crete’s shared site photo collection. Project-specific photo identification is pending.
Set-up: Boom pumps coordinated around a tight hospital site
A live, tight-access hospital site with suspended slabs and limited room for set-up.
View projectSet-up: 42m and 51m boom pumps across Buildings A, B, D and E
Four buildings pouring in parallel on a dense inner-Sydney site with a fixed program.
View projectSet-up: Boom pumps across a multi-stage waterfront build
A multi-stage waterfront apartment build with staged slabs and constrained street access.
View projectIt depends on access and the placement area. Send the site details and we will confirm the set-up with you.
As early as you can. Reviewing access before the pour date gives the most options.
Choose the work closest to your project.