Industrial Warehouse, Marsden Park
- Industrial
- Pump, place and finish
- 51m boom pump supported by line pumps
- Marsden Park NSW
- $1.5M pump, place and finish | 2,000m³ concrete slab
When the job gets bigger, we bring out the boom. Our truck-mounted boom pumps are built for high-volume pours, delivering concrete fast, clean, and exactly where it’s needed. With powerful reach from above, we place concrete with speed and precision, cutting down labour, saving time, and keeping your project moving without delays.
Boom pumps are used for larger, higher-volume pours. We can’t confirm the right pump, reach or set-up online. We go through the job details with you first.
The earlier, the better. Call or send a request, and we can look at the job properly before we talk dates.
Hulkcrete will confirm project requirements before scheduling.
Real Hulk Crete work on site, alongside project details from the capability statement. The gallery photos are not attributed to the named projects.



From Hulk Crete’s shared site photo collection. Project-specific photo identification is pending.
Set-up: Boom pumps coordinated around a tight hospital site
A live, tight-access hospital site with suspended slabs and limited room for set-up.
View projectSet-up: 42m and 51m boom pumps across Buildings A, B, D and E
Four buildings pouring in parallel on a dense inner-Sydney site with a fixed program.
View projectSet-up: Boom pumps across a multi-stage waterfront build
A multi-stage waterfront apartment build with staged slabs and constrained street access.
View projectTalk these points through with us before the day. They are general points only. They are not site instructions, approvals or project advice.
Every site is different. Hulkcrete will discuss the requirements of your project with you and confirm the appropriate approach directly. Information on this website does not approve a site, placement method or equipment selection.
How equipment reaches the placement area, and what is around it.
The area available for set-up and placement, and how it is controlled during the pour.
How concrete delivery is coordinated with the placement window.
Ground, weather, and conditions on the day that affect how work is planned.
Anything overhead or adjacent that needs to be discussed before the pour.
Who is present, who is coordinating, and how communication happens during placement.
Choose the work closest to your project.
Slab on ground, extensions and driveways for residential builds.
Narrow side access, backyards, pools and low clearance work.
Staged commercial programs where placement has to stay on schedule.
Larger industrial placements planned around site conditions.